Complete Streets Project

The August 2017 opening of the I-580 freeway extension reduced traffic volumes along the South Carson Street corridor by over 40 percent, allowing for the transformation of the corridor from that of a state-owned major arterial serving through-traffic into a calmer, City-owned multimodal street. The South Carson Complete Street project plans to convert this large corridor into more productive uses that facilitate comfortable, convenient, and safe travel for pedestrians and cyclists; improve access to abutting businesses; spur private investment in this important and vibrant commercial corridor; increase driver safety; and prepare Carson City for future Smart City advancements.

The project includes pedestrian safety measures, ADA-compliant sidewalks and curb ramps, narrowed travel lanes, a multi-use path with landscaping buffer, dedicated bicycle facilities, critical improvements to stormwater infrastructure , improved business access, public art, lighting fixtures, new signals, and fiber optic communications. The project limits extend approximately 2.5-miles from Fifth Street to the I580/US 50 interchange. Design for the South Carson Street Complete Streets Project has started. The project is utilizing the Construction Manager-at-Risk (CMAR) project delivery method. Sierra Nevada Construction (SNC) was recently selected as the CMAR and will join the City-led design team to advance the design over the next year. Public outreach and informational updates are planned throughout the duration of the project. Construction is anticipated to start in the spring/summer of 2019.